• 5 Sept. 2008
    • Status of PAS(Physics Analysis Summary for abroad CMS) was presented in HI EAST meeting.
    • Status of inputting HI HLT path into pp startup was presented in HI DAQ/HLT meeting.
      • pdf
      • Timing and rate study

-- JiHyunKim - 15 Sep 2008

Edit | Attach | Watch | Print version | History: r1 | Backlinks | Raw View | WYSIWYG | More topic actions
Topic revision: r1 - 2008-09-15 - JiHyunKim
 
KOREA-CMS
This site is powered by the TWiki collaboration platform Powered by Perl This site is powered by the TWiki collaboration platformCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding KoreaCmsWiki? Send feedback