- preperation for installation of RE1/1 -in point 5
- check HV cable(endcap region)
- gas-system, cooling-system
Daily Plan &status
14.Jan.2009
in ISR
- coaxial cable(from korea) Q.C ->
complete
- FEB -> coxail cable ->
complete
check pin
connect smooth
well lock
- make cupper sheet-4 sets ->
complete
- make mylar -4 sets ->
complete
gas flow test
| time | chamber | channel |
| 15:56 | RE1/1-001_top | 3 |
| RE1/1-001_bottom | 1 |
| RE1/1-002_top | 5 |
| RE1/1-002_bottom | 4 |
| each channel-1 litter /hours |
in P-5
- positioning for installation (about three empty chambers)
succeed one chamber
15.Jan.2009
in ISR
start cosmic muon test
RE1/1 chamber channel
HV channel set up
| gap | ch | station | box | box_ch |
| RE1/1-001_bot | 0 | 10 | 7 | 1 |
| RE1/1-001_top | 1 | 10 | 7 | 2 |
| RE1/1-002_bot | 2 | 8 | 3 | 3 |
| RE1/1-002_top | 3 | 8 | 6 | 1 |
cosmic muon test
| time | HV(kV) | chamber | current | time | HV(kV) | chamber | current |
| 11:07 | 0.50 | 001_bot | 0.02 | 14:30 | 4.00 | 001_bot | 0.04 |
| 001_top | 0.00 | 001_top | 0.04 |
| 002_bot | 0.01 | 002_bot | 0.03 |
| 002_top | 0.00 | 002_top | 0.00 |
| 11:12 | 0.75 | 001_bot | 0.02 | 14:35 | 6.00 | 001_bot | 0.05 |
| 001_top | 0.01 | 001_top | 0.05 |
| 002_bot | 0.01 | 002_bot | 0.03 |
| 002_top | 0.00 | 002_top | 0.02 |
| 11:27 | 1.00 | 001_bot | 0.03 | 14:40 | 8.00 | 001_bot |
| 001_top | 0.02 | 001_top |
| 002_bot | 0.02 | 002_bot |
| 002_top | 0.00 | 002_top |
| 11:27 | 1.50 | 001_bot | 0.03 | 14:45 | 9.00 | 001_bot | 0.07 |
| 001_top | 0.02 | 001_top | 0.09 |
| 002_bot | 0.02 | 002_bot | 0.05 |
| 002_top | 0.00 | 002_top | 0.04 |
| 11:27 | 1.75 | 001_bot | 0.03 | 14:50 | 9.20 | 001_bot | 0.07 |
| 001_top | 0.02 | 001_top | 0.09 |
| 002_bot | 0.02 | 002_bot | 0.04 |
| 002_top | 0.00 | 002_top | 0.04 |
| 11:27 | 2.00 | 001_bot | 0.03 |
| 001_top | 0.02 |
| 002_bot | 0.02 |
| 002_top | 0.00 |
DAQ-cable lavel
| RE1/1-001 | D | station 8 | A1 | A2 |
| C | station 7 | C1 | C2 |
| B | station 7 | B1 | B2 |
| A | station 7 | A1 | A2 |
| RE1/1-002 | D | station 9 | B1 | B2 |
| C | station 9 | A1 | A2 |
| B | station 8 | C1 | C2 |
| A | station 8 | B1 | B2 |
LV
| RE1/1-001 | ch 6 |
| RE1/1-002 | ch 8 |
15:37
5000 events start
16:32
missing channel 생김
연결을 다시 함 station 8.9 연결
16:44
event 5000개 받음
run No. 5325,run No. 5326
monitorring을 위해서 station을 현재 3개에 걸쳐 나오는 채널들을 2개로 옮기기 위한 시도
run N0. 5327
station4-RE1/1-001
station5-RE1/1-002
17:20 50,000events 시작 ->
run No.5329
| station No. | st.4 | st.5 |
| cluster size | 1.29 | 1.39 |
| efficiency | 48.6% | 52.0% |
run No.5330~5340까지는 준비과정
16.Jan.2009
in ISR
cosmic muon test
PMT가 크기 때문에 efficiency가 낮게 나왔다고 결론 PMT size가 작은 것을 이용해 다시 test
---- ->scintillator
--------- ->scintillator
--------- ->scintillator
19.Jan.2009
in ISR
- cosmic muon test
cosmic muon test
efficiency가 낮게 나와서 sintillator와 test chamber사이에 있던 chmber(RE2)를 치우고 chamber바로 위에 scintillator를 두고 start again
20.Jan.2009
in ISR
- preperation to gas pipe(change system(1supply+1return -> 2supply+2return) -> =complete
- cosmic muon test(Cont.)
in P-5
- check HV-cable(Cont.)
- mapping for gas-system,cooling-system
21.Jan.2009
in ISR
- soldering coxial cable on top-gap for 4th chamber -> =2/3 chambers
- cosmic muon test(Cont.)
in P-5
- check Hv-cable(Cont.)
Still one channel occur problem. --> one of connector failed. Now, use only 9 connectors.
- fitting gas-lines
22.Jan.2009
in ISR
- soldering coaxial cable on top-gap for 4th(1/3) & 5th chamber
finish soldering coaxial 4th & 5th
- cosmic muon test(Cont.)
in P-5
- check Hv-cable(YE- far)(Cont.)
- fitting gas-lines
finish
23.Jan.2009
in ISR
- assembly chamber(4th)
- cosmic muon test(Cont.)
in P-5
- take off chambers(4th,5th,6th)
cosmic muon test
15:30
gas system 변동에 대비할 수 있도록 kill 자리에 signal cable 연결
15:50
HV 전부 Down
지금까지 받은 data
| Run No. | HV(kV) | RE1/1-001 | RE1/1-002 |
| 5341 | 8.8 | 34% | 55% |
| 5342 | 9.0 | 57% | 75% |
| 5343 | 9.2 | 88% | 88% |
| 5344 | 9.4 | 95% | 93% |
RPC-KR Meeting
(in ISR, K.S.LEE, H.C.KIM, H.B.RHEE)
- chamber translation(28. 1 .09) 나무box를 준비해야함 11:00 pick-up
- gas-pipes 디자인을 확인해야함
- gas distribution box에서 connector를 교체해야 함
- Documentation (.doc_file) TDR을 위해
- HV block connector
- Temperature sensor
25.Jan.2009
- soldering coaxial cable
4th&5th finish,6th 1/3
- cosmic data(at 9.6kV)
- chamber position test
26.Jan.2009
in ISR
- soldering coaxial cable
6th 1/2 finish
- chamber position test
finish
- 3rd chamber HV test
2kV
in P-5
- remove dummy chambers
27.Jan.2009
in ISR
- soldering coaxial cable
finish
- 3rd chamber HV test
7000V에서 0.7까지 current가 오르는 현상이 일어나서
gas flow를 2litter/hour로 바꾸고 6500V에서 test 시작
현상태는 0.13~0.16까지 계속 fluctuation
- gas connection mapping =make map for connection (Auto CAD)
28.Jan.2009
- real mapping (using 5th & 6th chamber)
- assembly for 4th chamber
29.Jan.2009
- assembly for 4th chamber
complete
- make gas-connector sample
- modify top cover of chamber
5th & 6th
2.Feb.2009
3rd chamber의 current가 계속 높게 나와 HV cable connector를 다시 만들기로 정함
bubble발생에 focus
3.Feb.2009
RE 1/1_003 Bottom 0.22
5th, 6th chamber bottom 프레임에서 inner gap이 뜨는 현상 발생
HV block 부분의 mylar가 문제라 추정 토의 후 제거할 예정
4.Feb.2009
- 5th chamber bottom의 HV block 부분을 제거해 구멍을 내보기로 함
- top cover(5th & 6th)의 나머지 assembly부분을 하기로 함
5.Feb.2009
- Bottom cover에 구멍내고 디자인 변경 35*55 -> 55*55
뚜껑문제 해결
- 5th chamber assembly finish
- 6th chamber는 완전 제거하지 않고 긁어내는 방식사용
*RE1/1 meeting(in ISR)
- cable service에 대한 도움을 줘야함
- Assembly & Q.C에 대한 documentation필요
- triggering sector,cooling,Documentation => end of March
- Next meeting (at monday 10:30)
6.Feb.2009
- ISR에서 불필요한 sample 정리
- gap 정리
| inside-lab | reuse | fresh | repair |
| outside-lab | old gap |
11.Feb.2009
- 4th ,5th,6th chamber 완성
- gas flow test start(각 chamber에 bottom에 단선으로 공급 return을 top에 공급 //gas distribution line이 6개밖에 없음)